Phase III Data Center: The project included a major expansion and reliability upgrade to an existing data room. The design included multiple levels and stages of protection including Analaser, FM 200 and Pre-action systems. The UPS was a parallel redundant 150KVA dry cell system with generator backup.

Phase VI Data Center: The project added a mirrored data center to the ever expanding Foxwoods Casino Resort. Analaser, FM 200 and Preaction protection systems were implemented with the Fire Alarm system to form sophistication stages of action responses and alarm indications. The UPS was three 300KVA UPS modules connected in a parallel redundant scheme with expansion capabilities for a fourth module. The system utilized wet cell batteries with a limited battery monitoring system.
 
State of Connecticut
Legislative Office Building

Town of Plainville
Linden Street School

City of Hartford
Alfred E. Burr Elementary School

Town of Montville
Mohegan Elementary School

Foxwoods
Resort & Casino

Amherst College